2t boiler agent coal wood fired
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
The main aim is to know boiler, steam turbine and describe cooling towers and condensers. Also calculate the power output of steam turbine power plant in Usually boilers are coal or oil fired. 3.1.3 Types of Boilers The boilers can be classified according to the following criteria. According to flow of water and hot gases: (a) Water tube (b Get Price
a coal-fired electricity generating plant and facilities. A. work breakdown structure (levels one through three) is shown is Table P3-27. You have the following information. available: A coal-fired generating plant twice the size of the; one you are estimating was built in 1993. The 1993. boiler (1.2) and boiler support system (1.3) cost $110 Get Price
Coal, Wood and Tire Fired Industrial and IPP/Co-Generations Boilers NA 20–75 Coal-Fired Boilers 38–83 20–66 Gas- and Oil-Fired Industrial Boilers 30–75 NA Glass Melting Furnaces 51–70 NA Steel Products Industry NA 42.9–90 Municipal Waste Combustors 45-70 16–87 Oil- and Gas-Fired Heaters 45–76 NA Process Units NA 40–85Get Price
These liquids are burned in the side walls. The vertical gas velocity is 3.5 m/s in the afterburner chamber at a thermal load of 25 Gcal/h. The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C.Get Price
The incineration plant for solid wastes in Gothenburg, Sweden, has been in operation since 1972 and consists of 3 furnace/steam boiler-lines with a nominal capacity of 15 tons/h solid waste each. The real mean capacity is 13,5 ton s/h depending on increased thermal value.Get Price
Boiler tubes, usually are made from carbon steel and are subject to. high rates of heat transfer, bending stresses due to uneven heating, especially at expanded or welded joints into headers or drums, external erosion from burners and flue gas, possible corrosion on the boiler side, and; occasional manufacturing defects.Get Price
a coal-fired electricity generating plant and facilities. A. work breakdown structure (levels one through three) is shown is Table P3-27. You have the following information. available: A coal-fired generating plant twice the size of the; one you are estimating was built in 1993. The 1993. boiler (1.2) and boiler support system (1.3) cost $110 Get Price
These liquids are burned in the side walls. The vertical gas velocity is 3.5 m/s in the afterburner chamber at a thermal load of 25 Gcal/h. The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C.Get Price
Boiler tubes, usually are made from carbon steel and are subject to. high rates of heat transfer, bending stresses due to uneven heating, especially at expanded or welded joints into headers or drums, external erosion from burners and flue gas, possible corrosion on the boiler side, and; occasional manufacturing defects.Get Price